    Follow Us - Colo@ Datacenter Facility Construction Progress

    Once completed the windows are gone, that will be a wall of louvers for air flow to service the heat rejection units and the generator.
  2. R

    Volumedrive about to deadpool?

    You guys that are sticking behind VD here are way off.... I say that, knowing some of the specifics behind both of the disasters from VD, including the amounts they abandoned and walked out on in past-due funds from GoRack Also we have a great relationship with their Leasing Vendor. Like...
  3. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    The entire room basically becomes a hot aisle.  You can expect to walk into the datacenter and feel the room temperature to be in the 78-82deg range.   Contrary to popular (mis)belief, the worst thing you can do is try and operate your datacenter like it's a walk in refrigerator.  Mixing and...
  4. R

    Volumedrive about to deadpool?

    The leasing company they use does not offer Capital leases, only operating leases. They were likely leased on 24-Month FMV terms, if it was originally a $700 server, the lease would have been $32/month for 24-months with a likely $300 residual balance at the end of the 24 month term. They could...
  5. R

    That's a lot of CRAC

    i know i know i know ;)
  6. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    Existing overhead delivery. Additionally raised flooring and trying to use pressure to "push" cold air up, is inefficient. Why fight the natural flow of air?
  7. R

    Volumedrive about to deadpool?

    They did the same thing with their FL setup they had previously :)
  8. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    It's fine by me, it's not as if our logo isn't plastered all over the place already :)
  9. R

    Volumedrive about to deadpool?

    I know the leasing company involved here, their leasing policies hold a blanket first right on any and all assets under the master schedule, if they are behind on any invoices, they'll take EVERYTHING.  They don't play :)
  10. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    Thanks guys, just trying to give a bit of a look into what goes on "behind the scenes" the next level up in the business :)
  11. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    It's an 80 cabinet expansion within the existing space on our 4th floor of 34 Peachtree, just a build out of more cooling a power capacity.  This includes the addition of another 500kw power system and N+1 heat rejection units into a 2nd floor space that is ambient, which adjoins our 2nd floor...
  12. R

    A sad state for VPS offers

    Nothing in ARIN's policies say you can't "give away" IPs. Thats just a marketing tactic. You do however, have to ensure that they are justifiable and maintain records of such.  You'll also find that a representative of your organization will also have to sign an attestation that the records are...
  13. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    08/21/2013 A ton of materials have arrived, pipe bending equipment to bend the 4" conduit for power runs, fuel-oil piping being installed and just a few pictures of the generator replacement that was previously done as well as 2 pictures of our overhead busway that is used in all our power...
  14. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    Thanks, we appreciate the business Matthew :)
  15. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    Thanks, we'll try and post some more "exciting" pictures as things progress
  16. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    In the grand scheme, containment is a minor cost. We have opted to go with a 'hard' containment solution. There are much more economical solutions based upon 'strip' door style containment. For example, Savvis, uses this heavily in all of their facilities, from the same vendor we are using. It...
  17. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    Each method has it's individual advantages and disadvantages. For us, due to the physical layout of our facility, cold isle containment is optimal from an installation perspective.  The key concept is you need to maintain the separation of your hot and cold to prevent intermixing of your return...
  18. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    We are actually working on some designs ala OVH and Facebook / Google for use in our dedicated servers, it makes no sense, operationally, to be wasting large sums of money on what are essentially shelves ;) 
  19. R

    Follow Us - Colo@ Datacenter Facility Construction Progress

    Will certainly try, however the facebook page should be open so you can browse it even if you don't care to use FB :) 