"The beta period taught us that the requirements of a large object storage cluster and a cloud computing storage cluster were quite different.
...
"The racks have two 60-amp, 3-phase, 208-volt power strips installed. To give you an idea how much power that is, we can redundantly power about 250 60W bulbs (or 3,000 LED bulbs) per rack "
https://www.dreamhost.com/blog/2016/09/12/dreamhost-builds-cloud/
...
"The racks have two 60-amp, 3-phase, 208-volt power strips installed. To give you an idea how much power that is, we can redundantly power about 250 60W bulbs (or 3,000 LED bulbs) per rack "
https://www.dreamhost.com/blog/2016/09/12/dreamhost-builds-cloud/