amuck-landowner

Follow Us - Colo@ Datacenter Facility Construction Progress

RyanD

New Member
Verified Provider
08/21/2013

A ton of materials have arrived, pipe bending equipment to bend the 4" conduit for power runs, fuel-oil piping being installed and just a few pictures of the generator replacement that was previously done as well as 2 pictures of our overhead busway that is used in all our power deployments that allows flexible circuit delivery to cabinets form 10A 120v to 30A 3-Phase.

20130822_112210.jpg

20130822_112324.jpg

20130822_112651.jpg

20130822_112902.jpg

20130822_111901.jpg

Our crash carts are all wide screen! 21" or better, lol  :)

20130822_111917.jpg
 

Jade

NodeServ
Verified Provider
08/21/2013

A ton of materials have arrived, pipe bending equipment to bend the 4" conduit for power runs, fuel-oil piping being installed and just a few pictures of the generator replacement that was previously done as well as 2 pictures of our overhead busway that is used in all our power deployments that allows flexible circuit delivery to cabinets form 10A 120v to 30A 3-Phase.

20130822_112210.jpg

20130822_112324.jpg

20130822_112651.jpg

20130822_112902.jpg

20130822_111901.jpg

Our crash carts are all wide screen! 21" or better, lol  :)

20130822_111917.jpg
That's awesome :) Brand new generator, good to go!
 

RyanD

New Member
Verified Provider
Pretty rendering :)

How many square feet of space is this upgrade/build?
It's an 80 cabinet expansion within the existing space on our 4th floor of 34 Peachtree, just a build out of more cooling a power capacity.  This includes the addition of another 500kw power system and N+1 heat rejection units into a 2nd floor space that is ambient, which adjoins our 2nd floor offices. :)
 

MannDude

Just a dude
vpsBoard Founder
Moderator
Hey Ryan, do you have any objection to me editing the title to include, 'Colo@'? Only ask because this is a great thread and would be easier for Google to pick it up :p
 
Last edited by a moderator:

drmike

100% Tier-1 Gogent
Obligation = objection :)  MannDude likes sleep ,that rare treat.

The post needs keyword tagging too.
 
Last edited by a moderator:

RyanD

New Member
Verified Provider
It's fine by me, it's not as if our logo isn't plastered all over the place already :)
 

MartinD

Retired Staff
Verified Provider
Retired Staff
You saw the cold aisle containment setup for the new rows, but here's what our existing rows are going to look like when the expansion is completed.

1a0ASZ4.png
Just out of interest, is there a reason you're going top down instead of bottom up?
 

RyanD

New Member
Verified Provider
Just out of interest, is there a reason you're going top down instead of bottom up?
Existing overhead delivery. Additionally raised flooring and trying to use pressure to "push" cold air up, is inefficient. Why fight the natural flow of air?
 
Top
amuck-landowner