amuck-landowner

Follow Us - Colo@ Datacenter Facility Construction Progress

EricGregory

New Member
One more photo of the interior of the generator room.  It's currently getting prepped to handle the new unit so yeah, it's a bit cluttered at the moment.

YPCxTSj.jpg
 

drmike

100% Tier-1 Gogent
^--- That's the generator room?   Lots of windows in there.  I am accustomed to the gen sets being hidden.
 

RyanD

New Member
Verified Provider
^--- That's the generator room?   Lots of windows in there.  I am accustomed to the gen sets being hidden.
Once completed the windows are gone, that will be a wall of louvers for air flow to service the heat rejection units and the generator.
 

drmike

100% Tier-1 Gogent
Thanks @RyanD.   You folks are doing  tons of work and investment in your space. 

This isn't some run of mill stash and go expansion.
 

EricGregory

New Member
Heh, yeah, it's a pretty substantial bit of construction :)  As always, if you've got any questions feel free to throw 'em at us  :)
 

zim

The Invader
Verified Provider
very cool thread... +1 for ericgregory and colo@

Curious, biometrics or rfid?
 

RyanD

New Member
Verified Provider
very cool thread... +1 for ericgregory and colo@

Curious, biometrics or rfid?
We use 2-factor and 2 independent systems

Elevators to access the 4th floor datacenter, the entire floor is access card controlled from the elevator

  - Independent system managed by building management, same access card but requires building security sign-off on card entry

Once you are on the floor with our datacenter all doors are additionally secured with another access card point as well as biometrics (fingerprint) which is of course matched to your access card so it is impossible to share cards ;)

We are looking to add a man trap style entry to the primary access point to the DC floor as well. Currently working on designs for that as it requires some modifications to walls, doors, and entry points ;)
 
Last edited by a moderator:

RyanD

New Member
Verified Provider
20130914_115400.jpg


Generator load in
 

Tyler.S

New Member
Verified Provider
PrintShops Of The Future below you might not like that genny running, unless you plan to share power when it goes out? lol
 

RyanD

New Member
Verified Provider
PrintShops Of The Future below you might not like that genny running, unless you plan to share power when it goes out? lol
The generator is in a sound attenuation enclosure as well as everything is mounted on vibration dampers, our other generator is located on the 4th floor directly above this one.

I would be more worried about the poor guy who's office is in between our 4th and 2nd floor generators ;)
 

Tyler.S

New Member
Verified Provider
The generator is in a sound attenuation enclosure as well as everything is mounted on vibration dampers, our other generator is located on the 4th floor directly above this one.

I would be more worried about the poor guy who's office is in between our 4th and 2nd floor generators ;)
Wow, no kidding eh? Poor guy won't know what hit him. lol
 

Tyler.S

New Member
Verified Provider
If they are running, he won't be at his desk. 3rd floor is a local county government office, they don't have a generator :)
Aww, not going to share your genny's and make the poor guys work when they could go home? lol
 

EricGregory

New Member
Here are a couple more pics from the lift this weekend.  This is our second 500kW generator.  This brings our total generator capacity up to 1MW.

55CIXe5.jpg

TUUngVp.jpg

FclqABA.jpg

DQWsfiu.jpg
 
Last edited by a moderator:
Top
amuck-landowner