drmike
100% Tier-1 Gogent
So CC is billing folks for power separately? That happens elsewhere too, semi uncommon for 120v stuff and normal rack configs.We pay $999/m as the base cost on our rack. Power is like $250/m per 20A or so?
We don't use support much and more often than not when we do It justifies them billing us network admin time.
Francisco
Would think power in Buffalo is very affordable since lots of hydro in Canada/region. $12+/A is on the low side Probably about a $2 profit per amp, minimum.
The power surcharge totally makes the low low prices less unbelievable.